TRANSWAT project expedition, March

For a long time, natural conditions prevented TRANSWAT project experts (V. Šarauskienė, D. Meilutytė-Lukauskienė, S. Nazarenko) from removing water level sensors from a flooded river. After the flood subsided, we finally managed to do it. Researchers will now be able to see the impact of the hydropower cascade on water level fluctuations in the Varduva River.

More about the project: https://lei.lt/en/transwat
Project is financed by: Interreg V-A Latvian–Lithuanian cross-border cooperation Programme 2014–2020. http://www.latlit.eu/


__
The contents of this publication are the sole responsibility of Lithuanian Energy Institute and can under no circumstances be regarded as reflecting the position of the Eu